- Delivered a 45-lot residential stage with full municipal servicing and seamless connection to existing neighbourhood and commercial infrastructure.
- Overcame challenging soil and grading conditions with extensive engineered fill and upgraded subgrade design to ensure long-term stability.
- Constructed a 20,000 cubic meter stormwater management facility with an integrated lift-station system, providing controlled discharge to a nearby tributary and meeting strict freeboard requirements.
- Installed major storm, sanitary, and water infrastructure, including large-diameter storm trunks, hydrant loops, and coordinated tie-ins to existing systems.
- Implemented a robust overland drainage and lot-grading strategy, protecting homes while accommodating future development.







